NEW DRAIN LOCATION ON OUR PUMP FLANGE VALVE

Return to news

NEW DRAIN LOCATION ON OUR PUMP FLANGE VALVE

Nouvelles

16 January 2022 | Published by

At Calefactio, continuous improvement is the motto that drives us to surpass ourselves, and to offer you the top products on the market. Obviously, none of this would be possible without your precious collaboration and comments. This is why we quickly jumped into solution mode when we noticed the location of the drain on our pump flange wasn’t optimal.

We’re very pleased to announce that we’ve replaced one of the two side pressure gauge ports with a drain to make it easier to get at. You’ll therefore be able to continue the monitoring of your system (Delta P) and system maintenance.

Thanks to our full bore brass ball valves, you save both time and money while reducing the number of unions required. You also avoid the risk of potential leaks. And, when replacing the pump, you’ll be certain no air gets into your system.

Our Delta pump flanges are available for 4 types of connections (NPT, SWEAT, PRESS and F1960), and in 5 sizes (¾”, 1”, 1¼”, 1½”, 2”). They’re suitable for any type of pump, even high-velocity ones, and they’re sold individually, in master packs or in two-packs. Do note that pressure gauges are not included.

Our kits include the following:

  • 1 ΔP valve with drain + 1 pressure gauge port;
  • 1 ΔP valve with 2 pressure gauge ports on either side;
  • 2 seals;
  • 4 nuts & 4 bolts;
  • 4 x 1⁄8″ plugs (installed).

 

Contact your representative and order yours now!

You can also consult the brochure or download the technical sheets:

You might also like

Celebrating 10 years of expansion: $50,000 in prizes to giveaway!

Published by - 4 August 2023

Calefactio is celebrating its 10th anniversary this year and that’s why the company has decided to give some presents plumbers and contractors across Canada by including random scratch tickets in their products this fall. The good news is that they are all winners! $50,000 in prizes will be give in to customers to thank them […]

Read more

Calefactio is on the move!

Published by - 17 March 2022

Already 7 months have elapsed since the construction work started on our new head office. With that we will be able to provide increased office and warehouse space that will better facilitate better logistics and customer service. A major project that will allow us to pursue our growth in the coming years, but also to offer more […]

Read more

NEW !

Hydronic Radiant Floor Heating & Snow Melting